Capital Project

Capital Project

PROJECTS

Capital Project Vote

  • Capital Project Vote results

    • Proposition 1A - Updates to building and facilities

      • Passed 110-68

    • Proposition 1B - Resurface track and replace fencing

      • Defeated 86-91

    • Proposition 2 - Use of Capital Reserve for purchase of new tractor

      • Passed 111-67


See link under District tab for more information

School Base Health Center Timeline

Construction begins late May
February 16th: At BOE meeting BOE awards bids
February 9th:  Bids open
January 1st: Job put out to bid - General Contractor, Electrical, Mechanical, Plumbing
November 29th:  SED approves project
October 4th:  Project passed. Next step drawings and project are sent to SED for approval.

School Base Health Center Vote

October 4th Vote
Results:  126 Yes 76 No

Capital Improvement Project: School -Based Health Center ~ September 2022

Cherry Valley-Springfield will be the next home of a Bassett Healthcare Network School-Based Health Center (SBHC). This will be a partnership between Cherry Valley-Springfield and the Mary Imogene Bassett Hospital. A SBHC provides comprehensive health care services to students in PK-12th grade at the school. The SBHC can become the student’s main health care provider, and it is able to take care of all primary healthcare needs, even when school is not in session. For students with a primary care provider the SBHC can work with the provider. There will never be any out-of-pocket expenses for SBHC services.  The SBHC program will bill the student's health insurance for services provided on site at SBHC. If the student does not have health insurance, there will be no charge to the student’s family for the health services provided.


The SBHC is staffed with: 

  • Nurse Practitioner /Physician Assistant who work under a Bassett Pediatrician 

  • Licensed Practical Nurse 

  • Ambulatory Office Assistant

  • Licensed Clinical Social Worker or a Licensed Mental Health Counselor 

  • Dental Hygienist 

  • Dietician


Services provided:

  • Complete physical examinations 

  • Recommended health screenings

  • Comprehensive health care including diagnosis and treatment of acute and chronic illness

  • Reproductive health care

  • Health education referral services

  • Preventive dental services and referrals

  • Immunizations, mental health screening, consultation and referrals

  • Counseling

  • Child Health Plus information and enrollment assistance


Our SBHC will be located in the high school wing, rooms 148 and 150. Parents will have access to the SBHC from the back parking lot. You will be able to enter there after being buzzed in.  We will begin sharing more details of the SBHC and how to register your school-aged child early spring 2023. It seems like a long ways away, but it will be here before we know it.  We are very excited to be able to offer this service to our families. As the process evolves we will share more information.


FINANCES

 

Who pays for what:

  • The cost to the District is the renovation of 2 classrooms 

    • (rooms 148 & 150)

  • Salaries/benefits for SBHC employees is the responsibility of Bassett

  • Equipment, hospital supplies, computers are also the responsibility of Bassett

  • The cost of heat, electric and cleaning is picked up by the District

How will CVS pay for the renovations:

  • Use of Capital Reserve:  $225,000

  • The project is aidable at our state rate of 81.5%

    • We will bond the balance of $433,050

      • 15 year bond as state aid is paid to us yearly for 15 years.

        • Cost to taxpayers is interest from the bonding which is minimal

  • Interest payments will not affect the tax levy. There will be no impact on taxes.


As of planning meeting on September 22nd:

  • General Construction/Plumbing/Mech/HVAC/Electrical        $552,683

    • Allowances for each built in

  • Soft costs                                                                                             62,010

                                                                                                                                    $614,693

District will complete all Demolition and any additional work that is allowable

Project has been reduced by $43,357

As of the end of August:

Broken down into four areas prior to final plans 

  • General construction                $150,000

  • Plumbing                                         80,000

  • HVAC/Mechanical                       100,000

  • Electrical                                         80,000

    Undesign details/Contingency       $102,500

  • Allowance (4%)                            $20,500

  • Escalation (3%)                              15,375

Hard Costs Construction                    $548,375

Soft Costs Administrative                  $109,675

TOTAL                                                   $658,050





Smart School Bond Act Update ~ October 2019  

Work is on schedule.  Approximately 80% of the building is rewired.  Drops have been installed and additional WIFI spots installed. In terms of security five cameras have been installed in the building.  During the month of November we hope to install the remaining cameras which include multiple exterior cameras.

Capital Project ~ October 2019

 The capital project is wrapping up.  We are working off the "punch list" which includes finalizing work by each contractor.  We have all new faucets in the student bathrooms.  The cafeteria has a new dishwasher and the drainage has been replaced.  The HVAC system has been updated and items replaced.  We are still working on a few issues related to the overall heating system.  The windows in the atrium have been replaced along with the platform steps.  Leaks on the roof have fixed along with targeting new areas of concern where we have found additional leaking. At the bus garage a new bush wash system has been installed.  We are still working on the drainage portion that is connected to the bus wash.  We hope to have that completed during the next month. The bus wash overhead doors were replaced.  Within the garage itself work was completed in the pit, heating system and metal columns.

Overall, the project went smooth.  After we tabulate our final cost we will look into a phase II portion where we may be able to repair additional items.  Many of the items when went out to bid came in under.  That may create funds that we may be able to use to make additional repairs.

Smart School Bond Act Update ~ May 2019  

The project is divided into three sections.  High Tech Security,  Classroom Technology and School Connectivity. High Tech Security includes replacement of old cameras and adding additional cameras, both inside and outside.  Classroom Technology consists of purchasing iMacs for the art lab, desktop computers for the library, and additional laptops for student and teacher use. School Connectivity consists of rewiring the building for Internet and wireless access. This last section requires us to go out to bid.  Bids will close on June 20th and the BOE will accept bids on July 15th.  Work will begin second shift on October 1st. 

Capital Project Kick -Off Meeting ~ May 16, 2019 

Tentatively work at the transportation building will begin on June 10th. Work in the main building will tentatively begin on July 1st.  We are aiming for majority of the work to be completed by the end of the summer.

Smart School Bond Act Update ~ January 2019  

Our original application was submitted July 2016.  We have been approved and feel confident with the adjustments that we made.  There are three phases to this project: School connectivity, Classroom technology and High tech security.  The largest piece of this grant is internal connections where we will be rewiring the entire building.  This includes updating our connections and wireless wifi.  We will also be adding cameras within the building and also external cameras.  Last, desktops in the library lab will be replaced, along with iMacs in the art department. Teacher laptops will also be replaced.

Capital Project Update ~ January 2019

Bids were open on January 25th.  Good news....bids came in under estimated construction costs.  Work will start at the bus garage in early June and work in the main building will start the last week in June.  

2018-19 $100,000 Capital Outlay Project Update ~ January 2019

Work has been completed and 5 entry doors to the building have been replaced (PK entrance, Middle School wing, High School wing, guidance office doors, and playground doors) 

Ccapital Project Update ~ October 2018

The SED project manager has approved the project and we can start preparing the project for bidding.   A tentative construction schedule will be developed with the majority of the work scheduled during the summer.

2018-19 $100,000 Capital Outlay Project ~ October 2018 

Project kick-off meeting is on November 1st.  Doors are scheduled to be delivered in November with work to start second shift in December.  

High School Gym ~ August 2018 

The High School gym floor has been resurfaced.  New LED lights will be installed this fall.

Ccapital Project Update ~ August 2018


We received confirmation that the architectural review has been completed by SED. The project is now under engineer review. Timetable looks like October now for approval.

2018-19 $100,000 Capital Outlay Project ~ July 2018

Five sets of exterior doors will be replaced; elementary entrance, playground entrance, HS wing entrance, MS wing entrance and guidance office wing entrance. Bids have been accepted. Working with contractor for installation dates.

Fuel Tank Project ~ June 2018

Project is complete and new fuel tank is working great.

2017-18 $100,000 Capital Outlay Project ~ June 2018

Fifty interior doors were installed throughout the building in classrooms, elementary and HS gyms, locker rooms, and cafeteria. 

 

 


How was the decision made to Proceed with a Capital (Building) Project?

Every five years, schools in New York State are mandated to complete a Building Condition Survey. CV-SCS retained Griffith Dardanelli, an architectural firm, to complete the survey the fall of 2015.  The Building Condition Survey studied every aspect our building and grounds, determining any areas that had exceeded their “useful life’, or would within a few years exceed their “useful life.”

In developing the scope of this proposed capital project, the Board of Education and its Building Committee used the data in the Building Condition Survey to determine what should be included in the project that we are now proposing.

In order to continue to protect our district’s investments in our school, and in accordance with the Building Condition Survey, several improvements need to be made to the building and grounds so that our school can continue to provide a safe and efficient learning environment for our community well into the future.


What is the Proposed Cost of the Project?

The proposed cost of the project is $3,120,000. The cost includes all costs associated with the project, including design costs, construction management costs, fees, incidentals, and actual construction costs.  

How will the Project Be Funded?

Cherry Valley-Springfield School’s State Building Aid Ratio is 81.5%.  This means that any part of the capital project that is aidable will be aidable at that percentage. Our project is all aidable items. The District has $97,470 remaining in EXCEL aid, which can be applied to specific parts of the project that address capacity, energy, accessibility, health, safety, and educational technology. The District also intends to use $460,700 of capital reserve to the project to reduce local share

With the use of EXCEL aid and capital reserve, the district will need to issue bonds to fund the remaining $2,564,830.  As the bonds are repaid over a period of fifteen years, the principal and interest will be offset by state aid calculated at the percentage noted above (81.5%).  The unpaid portion of the expense is referred to as the “local share”, which will be, on average, $24,338 per year.  An estimated average annual impact per $100,000 full value property will be $5.26.

 


SBHC Vote

Tuesday, October 4, 2022

Noon to 8:00 PM

Voting will take place at the school.

Please use band room entrance.
View text-based website